CMS for Suspected Air Deposition and Culvert 105 Study Areas

FMC is conducting environmental studies relative to possible historic releases of contaminants from the FMC Middleport plant under the terms of an administrative order on consent with the U.S. Environmental Protection Agency and the N.Y. State Department of Environmental Conservation and as required under the federal Resource Conservation and Recovery Act (RCRA).

FMC completed a Draft Corrective Measures Study (CMS) Report for the suspected air deposition study area south of the Erie Canal and west of the county line and the Culvert 105 study area, and issued a Draft Corrective Measures Study (CMS) in May 2011.

The Draft CMS Report identifies and evaluates remedial alternatives (corrective measures) ranging from “no further action” on properties to remediation to specific levels of soil arsenic concentration.

Documents associated with this CMS can be viewed at the links listed below or at the FMC document repository at the Royalton Hartland Community Library at 9 Vernon Street in Middleport:

WORKPLANS

 


CMS CORRECTIVE ACTION OBJECTIVES AND STUDY AREA MAPS

 

 


DRAFT CMS REPORT


~ To view a video of balloons marking the proposed CAMU height – June 2011 click this link. ~